Close

If you would like to learn more about our
Industrial expertise, please give us a call.


Ascend Performance

Decatur, AL
Cantonment, FL

93,612 sq. ft. 
Reroof — replace HVAC curbs and asbestos abatement 

29,000 sq. ft.
Maintenance 

Kimberly Clark

Mobile, AL

1,313,440 sq. ft.
Reroof

Hyundai

Hope Hull, AL

Engine Shop — 350,000 sq. ft.
New Construction - Roofing 

Paint Shop — 161,750 sq. ft.
New Construction - Roofing 

Central Energy Building —17,220 sq. ft.
New Construction - Roofing 

Exxon Mobile

Cantonment, FL

34,212 sq. ft.
Reroof —install perimeter fall protection system 

Talladega Waste Water Treatment Plant

Talladega, AL

6,200 sq. ft. 
Reroof  — modified bitumen 

Packaging Corporation of America

Jackson, AL

Recovery Boiler Room — 6,700 sq. ft. 
Reroof  — modified bitumen 

Steam Turbine Generator — 2,200 sq. ft.
Reroof  — modified bitumen 

Putnam Filter Plant 

Birmingham, AL

14,600 sq. ft.
Reroof  — modified bitumen 

Alabama Power Company 

Tallasee, AL 

Leeds, AL

Demopolis, AL

Wetumpka, AL

Calera, AL

Lanett, AL

Eufaula, AL

Mobile, AL

Tallassee Crew Headquarters  — 8,700
Reroof — PVC

Leeds Transmission Substation  — 3,800
Reroof — TPO

Demopolis Transmission Substation  — 1,000 sq. ft. 
Reroof — TPO

Jordan Dam Transmission Substation  — 3,200 sq. ft. 
Reroof  — TPO

Calera Transmission Substation  — 1,000 sq. ft.
Reroof  — TPO

West Point Distribution Substation  — 2,700 sq. ft. 
Reroof  — TPO

Eufaula Distribution Substation  — 1,000 sq. ft.
Reroof  — TPO

Big Creek Distribution Substation  — 900 sq. ft.
Reroof  — TPO

Complex Building 9 Calera, AL  — 33,700 sq. ft. 